Past Projects

  • 2013 – Sugar Australia – Yarraville – Triples Evaporator
  • 2013 – Sugar Australia – Yarraville – Brown Sugar Packaging (0.5M)
  • Baltecies/Origen Energy – Port Adelaide SA – Stack Replacement Project
  • Air Liquide – South Australia – Blowers & Vacuum Pump Replacement
  • Mobil Altona Refinery – Workshop – 2014 Turnaround Piping
  • Sugar Australia – Yarraville – Affination Plant
  • BOC Cryo centre ASU Gas plant Dandenong Vic
  • Orica – Laverton – Chlorine Plant
  • Orica – Deer Park – Pisba Plant
  • United terminal 300 replacement pipeline
  • Air liquide Co2 plant Lang Lang
  • Qenos scal 2 upgrade Worley Parsons / Transfield ( Value 1.4M )
  • Pedestrian Link Melbourne, ABI Group ( Value 1.2M)
  • Kyneton Stock Feed processing plant, Performance Feeds P/L (.6M)
  • Numurka Refinery upgrade, Australasian Plant Design ( 1.5M)
  • Spencer Street Redevelopment project Leighton’s Construction (1.8M)
  • Mogas Project Shell Company of Australia (.85m)
  • Technip Off shore Rig installation ( 1.4 M)
  • Australasian Lubricants Manufacturing Company Blending Facility upgrade ( 3.1M)
  • OPC / Nabors Off Mud Pump Base structures ( .3M)
  • OPC / ESSO Pipeline replacement (.6)
  • Melbourne Cement Facility Silo A ( 1.7M)
  • Steel Cement Separator Upgrade ( 1.8M)
  • OPC / Mearsk Drilling (4.5)
  • Boskalos channel widening (1.6)
  • Bass Gas (.13M)
  • Air Liquide Bass Gas (.3M)